 Name: Lake Maria Road, South Branch Rock River Bridge

Start date: 9/22/2025 Proposed end date: 11/14/2025

Schedule: See attachment for accepted preliminary schedule submitted by contractor

Length of project: 0.045 miles

Cost: $516,678.70

Location (including city and/or county(s)): Town of Alto, Fond du Lac County

Description of project: Local Program Bridge Replacement rehabilitation project, approximately 0.045 miles, over South Branch Rock River located in Town of Alto, Fond du Lac County. Replace the existing single span concrete flat slab bridge with single span concrete flat slab bridge. Approach rehabilitation includes base aggregate dense, common excavation, and HMA pavement.

Traffic impacts: No detour provided. Lake Maria Road closed to through traffic. Traveling public can go around Lake Maria Road by using Oak Grove Road and CTH EE (N/S) and CTH AS (E/W).

Contractor and city where contractor is located: Pheifer Brothers, Neenah, WI

Name of person providing Weekly Advisory updates (including e-mail address and phone #)

Name: Evan Opgenorth E-mail: [email protected] Phone #: 920-207-4080

Benefits of project to motorists and others: Replacing the existing bridge significantly improves safety by addressing structural deficiencies and modernizing design standards to better protect motorists and pedestrians. It also enhances traffic flow and reliability, reducing delays caused by aging infrastructure. Overall, the new bridge ensures safer, more efficient travel for the entire community.